Product Information
In high-rise building construction, workers need to travel frequently between floors. Traditional ladders or manual lifting can waste a lot of time and manpower. Site lifts can transport workers and materials quickly and easily from the lower floors to the upper floors, improving construction efficiency and saving time.
Cage size | 3x1.5x2.4 |
Rated capacity | 2x2000kg |
Max installation height | 300m |
No | Items | Unit | Parameters | Remarks |
1 | Rated load | kg | 2x2000 | Double cage |
2 | Rated load of installation/dismantle | kg | 2x1000 | Double cage |
3 | Rated lifting speed | m/min | 0~75 | Drive ratio of reducer 1:14 |
4 | Max lifting height | m | 300 |
|
5 | Cage size(L*W*H) | m*m*m | 3x1.5x2.4 |
|
6 | Cage bottom height | m | 0.46 |
|
7 | Wall clearance of framework | m | ≤9m |
|
8 | Height of guide rail overhang | m | ≤9m |
|
9 | Voltage | v | 380V±5% |
|
10 | Motor power | kw | 2x3x20 | JC=25% |
11 | Frequency converter | kw | 75 |
|
12 | Rated operating current | A | 2*3*60 |
|
13 | Weight of standard section | kg | 150(166) | 650x650x1508mm |
14 | Weight of single cage(incl. Drive system) | kg | 1830 |
|
15 | Machine weight | t | 30.3 | H=200m |
16 | Safety device model | SAJ50-2.0 |
Construction Site Jack Up Topcit Lifting Quipment Tower Crane
1.Reduce labour intensity by using site lifts to transport heavy loads directly to designated locations, saving workers from the strain of carrying heavy loads.
2.Site lifts can improve the efficiency of transporting workers and materials, reducing the risk of workplace accidents and protecting worker safety.
3.To enhance the project's quality, site lifts can efficiently transport workers and materials to the designated location, preventing worker fatigue caused by repetitive lifting. This ensures the construction of a high-quality project.