Precautions before installation and commissioning

① Determine the operation technical personnel and operators;

② According to the material granulation, the equipment is complete.

③ Confirm whether there is a pit and whether the size is correct and reasonable;

④ Explain safety common sense to the field staff and provide technical guidance.

⑤ Check whether the equipment number issued is missing or not, and whether the manual is complete.

⑥ Site preparation: whether the handling tools, lifting tools, assembly tools, water and electricity are complete, whether the raw materials are in place, and whether there are obstacles (columns, roofs) on the installation site;

After installation and debugging, in order to achieve customer technical personnel or operators to clear the main equipment of the production line, according to the instruction manual for operation and maintenance essentials of learning guidance, pressure wheel, mold and other wearing parts must be disassembled and operated again. The set time of the dry pump, the maintenance simulation operation of the oil outlet without oil is performed once.